Pacheco Koch was selected as a sub-consultant for the design of Segment 16 of the Integrated Pipeline project for Tarrant Regional Water District, which included approximately 16 miles of 96-inch raw water transmission main from Richland Chambers Lake north to the intake for a booster pump station.

Pacheco Koch’s duties included assisting with the corridor study of the 16-mile section and a detailed parcel-by-parcel route evaluation of approximately three miles of the project. Following finalization of the route, Pacheco Koch performed the detailed design of the same three-mile segment of the project.

 