Dallas Utilities Elm Fork Treatment Plant

Pacheco Koch was selected as a sub-consultant to provide civil-site design on the Elm Fork Water Treatment Plant Water Quality Improvements Project. Project components included an immediate maintenance and rehabilitation project, a preliminary design report and associated conceptual design of the overall plant water quality improvements, and multiple detailed design and bid packages over a five to seven year time frame. Major improvements included a new membrane filter complex, sedimentation/flocculation basin, residuals handling facilities and off-site sludge handling facilities. Pacheco Koch is provided land surveying and civil engineering design services related to site grading, drainage and paving.


error: Content is protected !!