Water Treatment Plant to Terrell Pipeline

Property research, easement document preparation and topographic surveying were performed for the North Texas Municipal Water District’s Tawakoni Water Supply Project from the Water Treatment Plant to Terrell Pipeline.

This project was 13 miles in length and the pipeline included 70 easement documents and 68,000 linear feet of topographic surveying within 50 feet on either side of the proposed pipeline centerline.  Seven miles of the pipeline is to run parallel with a 12-inch ATMOS Energy gas pipeline. Extensive coordination with ATMOS Energy, as well as Kaufman County and NTMWD was required.

 