Trinity River Main Stem Pump Station

North Texas Municipal Water District selected Pacheco Koch for surveying and subsurface utility engineering services related to 17 miles of pipeline design from the City of Crandall to the Trinity River.

The scope includes 45 easement documents and topographic surveying for a majority of the line using LiDAR and aerial photogrammetry techniques within 150 feet on either side of the proposed pipeline centerline. Subsurface utility engineering was performed in accordance with ASCE Standard Guidelines. Extensive coordination with Oncor and Kaufman County were required.

 

 


error: Content is protected !!