LBJ Managed Lanes Project

Pacheco Koch provided surveying construction staking services for multiple water, wastewater, Oncor electric, and telecommunication lines for the LBJ Managed Lanes.

The project included review of construction plans and checking/verifying correct alignments for horizontal locations and the profiles for correct vertical location as well as the creation of calculated stakeout points. After the lines were constructed, collection of positional data for the as-built locations of these lines and appurtenances was performed. The project scope includes approximately 17 miles of roadway and is split into three segments. Coordination was necessary with multiple entities to make sure that lines were staked correctly and within the needed time frame.